Cefn Coed
Escalada
Regulacions el 30 d’octubre del 2026
Prevalen els cartells al lloc i les resolucions posteriors; consulta la font.
La posició assenyala el lloc, no l’extensió de la norma.
-
Prohibit tot l’any
Escalada · Tot l’any
Vigent el 30 d’octubre del 2026
Sense confirmar per una font oficial.
Climbing is currently banned at this venue - it lies within a local Nature Reserve and a legally designated SSSI. It has been reported that climbers have recently cleared vegetation, placed lower off bolts and the clearance of mature trees to re-develop the site, without consultation or permission from the either land owners (local authority) or the Wildlife Trust, all potentially illegal activities within an SSSI, have led to them to take this action. Following the finished works to the bridge, the BMC has requested a site visit from the wildlife trust and has been refused, access will remain closed to this site (September 2026).
Publicat per BMC, 17 de set. del 2026 · Cefn Coed