Regulacions Austràlia Wilsons Promontory National Park
Little Oberon
Escalada
Regulacions el 30 d’octubre del 2026
Prevalen els cartells al lloc i les resolucions posteriors; consulta la font.
La posició assenyala el lloc, no l’extensió de la norma.
-
Activitat regulada
Escalada · Tot l’any
Vigent el 30 d’octubre del 2026
5.10 Rock climbing and abseiling
[…]
A permit system monitors levels of use and impact, and is also intended to enhance climbers’ safety. Additional sites for climbing may be permitted under the permit system. To reduce site impact, only ‘clean climbing’ (those techniques which do not damage or deface the rock) will be permitted. There may be a need to define access tracks to prevent the formation of multiple tracks to the top and base of climbs.
[…]
Management strategies
- - Permit rock climbing using ‘clean climbing’ techniques at Little Oberon, Mount Bishop, Mount Oberon, Squeaky Beach Boulders, Turtle Rock and other appropriate sites. Define access tracks as necessary.
Publicat per Parks Victoria · Wilsons Promontory National Park Management Plan
A Wilsons Promontory National Park
Zona regulada
Wilsons Promontory National Park
Regeixen a tot l’interior del límit, hi hagi o no un lloc assenyalat.
-
Prohibit tot l’any
Parapent · Tot l’any
Vigent el 30 d’octubre del 2026
TABLE 3 SUMMARY OF RECREATION ACTIVITIES
ACTIVITY, ZONE, OVERLAY
1, 2, 3, 4, 5, 6, A, B
[…]
Hang gliding & paragliding, No, No, No, No, No, No, No, No
[…]
KEY:
[…]
No, Not appropriate
Publicat per Parks Victoria · Wilsons Promontory National Park Management Plan
-
Cal autorització
Acampada i bivac · Tot l’any
Vigent el 30 d’octubre del 2026
5.7 Camping outside the Recreation Zone
There are excellent opportunities for camping in a variety of spectacular natural settings at the remote outstations in the park, and this activity has become increasingly popular. A permit system has been used since the late 1960s. This sets maximum group sizes and lengths of stay to safeguard visitors and their experience, and minimise visitor impacts.
[…]
Management strategies
[…]
- - Maintain a permit system controlling the use of established campsites, incorporating an appropriate system for regulation of boat-based campers and off-track hikers using other locations.
[…]
- - Permit camping by sea kayak parties at designated locations using the ‘off-track’ hiker-permit system.
Publicat per Parks Victoria · Wilsons Promontory National Park Management Plan
-
Activitat regulada
Senderisme · Tot l’any
Vigent el 30 d’octubre del 2026
5.6 Bushwalking
[…]
Although a permit system limits the numbers of overnight walkers, high use levels of the more popular walking routes and campsites in the southern part of the park have necessitated continual maintenance work on the tracks.
[…]
Off-track walking can impact on soils and vegetation through the development of unoffical tracks. This activity is currently managed through a permit system.
[…]
Management strategies
[…]
- - Continue to manage overnight walking through the camping permit system (section 5.7).
- - Manage off-track walking through a permit system, taking into account measures to prevent the spread of Cinnammon Fungus (section 4.7).
Publicat per Parks Victoria · Wilsons Promontory National Park Management Plan